Questionnaire
To calculate the biogas plant
1. Company contacts
2. Contacts of the responsible person
3. Raw materials for biogas production
Cattle manure, distillery stillage, beet pulp, corn silage, dairy waste, grain waste, vegetables, etc.
4. Territorial boundaries of the future biogas complex
According to the Land Cadastre map, address or GPS coordinates
5. Is the plot located within a settlement? (yes/no)
6. Distance from existing buildings (needed to determine the sanitary protection zone)
7. Purpose of biogas production (+/-)
8. Existing infrastructure (near the site)
9. Need to include infrastructure facilities in the project (+/-)
10. Client wishes (please underline preferred option)
11. Availability of engineering-geological surveys for the site (yes/no)
12. Availability of geodetic surveys for the site (yes/no)
13. Desired start of design (quarter, year)
14. Planned start of construction (quarter, year)
15. Project funding source (own funds, bank loans, grants, government programs, seeking an investor, etc.)
16. Other additional information
17. How did you learn about AC GROUP