Horodyshche-Pustovarivske, Kyiv region
Biogas complex (Horodyshche-Pustovarivske)
Construction of a complex for the processing of organic waste and silo into biogas for the production of electricity and heat.
Main project activities:
Earthwork, construction of monolithic reinforced concrete radial structures (methane tank), manufacturing and installation of metal structures, girding of district heating substation, installation of Jenbacher generators, complex arrangement of engineering networks (plumbing and electrical networks).
Raw materials (per day):
beet pulp — 133 t,
silage — 133 t,
molasses — 9 t,
cattle manure — 20 t.
Object power
Electricity
2400 kW/h
Type of construction
New construction
Construction period
05.2018 — 04.2019
Building area
2408 m2